AARC Online
AARC Online
  • Proving Ground

    • About Us
    • Site History
    • Partnerships
    • Weather Conditions
    • Where to Stay
    • COVID-19
    • Latest News
  • Tracks & Facilities

    • Site Map
    • Workshops & Offices
    • ADAS Testing
    • Engineering Service Providers
  • Events & Product Launches

    • Host an Event at AARC
  • Resources

    • Regulations Manual
    • Safety Operating Procedures (SOP)
    • Conditions of Hire
    • Driving Directions
    • Site Map
    • AARC Brochure
    • Incident & Hazard Reports
    • Defect Form
  • Induction

    • Site Induction
    • Event Induction
  • Enquiries & Bookings

    • Track Booking Enquiry
    • Event Booking Enquiry
    • Contact Us

Safety Operating Procedures (SOP)

Click the links below to view the Safety Operating Procedures at AARC.

SOP #7 - ABS PUMP

SOP#45 - VEHICLE VALIDATION PRECINCT (VVP)

SOP #50 - 5% GRADIENT

SOP #55 - DYNAMIC HANDLING FACILITY 

SOP #56 - DHF PUMP

SOP #57 - BASALT AND CERAMIC TILES

 

Wensleydale, Australia
Australian Automotive Research Centre

445 Gum Flats Road
Wensleydale, Victoria
Australia 3241

(+61 3) 5288 7306

(+61 3) 5288 7225

Subscribe

For AARC updates and industry news

Connect with Us

AARC is a

Linfox

company

  • About Us

  • Site Map

  • Host an Event at AARC

  • Contact Us

  • Disclaimer

  • Privacy Policy

© Copyright 2025 AARC | All Rights Reserved

Designed by

Soul + Wolf